Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
13.1. Specifications
13.2. Maintenance service
13.3. Small damages of a body
13.4. Large damages of a body
13.5. A forward bumper
13.6. A back bumper
13.7. A cowl
13.8. A cable of a drive of the lock of a cowl
13.9. The cowl lock
13.10. Doors
13.11. The internal panel of a door
13.12. The door lock, the switch of the lock and a handle detail
13.13. Glass of a door and стеклоподъемник
13.14. A cover of a luggage carrier (sedan)
13.15. A cover of a cargo compartment (a compartment and a hatchback)
13.16. The lock of a cover of a luggage carrier (sedan)
13.17. The lock of a cover of a cargo compartment and the handle
13.18. Details of the central lock
13.19. External glasses
13.20. A windscreen, back glass and stationary glasses
13.21. The hatch
13.22. Decorative overlays of a body
13.23. Seats
13.24. Panels of facing of salon
13.25. Average section of the forward panel
13.26. Details of forward facing of salon
14. An electric equipment
 







13-26-detali-perednejj-oblicovki-salona.html

13.26. Details of forward facing of salon

Removal and installation

PERFORMANCE ORDER
Perchatochnyj box
1. Turn on from below two screws and get a box.
2. Assemblage is carried out upside-down.
The bottom section of the forward panel from outside the driver
3. Turn away screws on top and bottom edges and remove section from the forward panel.
4. Assemblage is carried out upside-down.
Average part of the forward panel with push-button switches
5. Disconnect the battery from weight.
6. Remove a cover from the check point lever
7. Turn away screws on both parties of the panel, cautiously displace forward.
8. Disconnect sockets of switches and remove the panel.
9. If necessary designate lines of plaits that at assemblage to lay plaits on former places.
10. Assemblage is carried out upside-down. Track that ventilating nozzles have entered into corresponding air lines.
Overlays of a steering column
11. Disconnect the battery from weight.
12. Turn on from below 6 screws, disconnect the bottom overlay from the ignition lock (a photo at the left) and submit downwards, having disconnected from latches of the top overlay (a photo on the right).
13. Translate both levers in extreme bottom position and cautiously remove the top overlay.
14. Assemblage is carried out upside-down.
Casing of the panel of devices with a ventilating nozzle
15. Remove overlays of a steering column.
16. Turn away two top bolts and incline a column a little.
17. Turn away screws of a decorative casing of the panel of devices (two at the left, two on the right and one in the bottom of (a photo on the right) and one at the top of (a photo at the left)).
18. Cautiously disconnect a casing from the forward panel. If necessary submit a column downwards for space expansion.
19. Assemblage is carried out upside-down. The top bolts of a column tighten with the set moment.


13.25. Average section of the forward panel

14. An electric equipment











https://www.youtube.com/channel/UCoah5uA-uF-j35-MalVTfRQ